|
PWUnit#1 treats produced and flowback water with Osorb® to remove dissolved and dispersed hydrocarbons and BTEX. Material used in this treatment process is regenerated in the RegenUnit#1.
Standing Footprint: 10' x 43'
Operating Footprint: 45’ x 25’
Power Requirements: 90 A, 480 V, 3 phase
Gross Weight: 10,000 lbs
Suction/Discharge: 3”
Rated: 100 psi
How it works:
1. Produced/flowback water is pulled into the system.
2. Water mixes with Osorb.
3. Osorb absorbs dissolved and dispersed organics.
4. Treated water outflows at 1.5 bbl (~ 65 gpm).
5. PWA returns all water to the client.
|
|
|